Meridian To Maxwell AFB
Contract Dates: 12/6/17- 9/6/20
Provided, installed, and maintained a 1.0 GB fiber circuit from Meridian Air-force base to Maxwell Air-force base. Met RTD requirements of 10 milliseconds.
Meridian To Maxwell AFB
Contract Dates: 12/6/17- 9/6/20
Provided, installed, and maintained a 1.0 GB fiber circuit from Meridian Air-force base to Maxwell Air-force base. Met RTD requirements of 10 milliseconds.